Stage Production & Rigging
المسارح والتعليق والإنتاج
The structure everything else hangs from. Staging, truss, ground support, motors and certified rigging crew — designed with load calculations, documented with a method statement, and built to pass venue inspection.
Rigging is the part of a show where mistakes are not recoverable. Everything else can be re-patched, re-programmed or worked around; a structure carries lighting, LED, audio and sometimes performers above an audience. It gets designed properly or it does not get built.
We produce load calculations, rigging plots and a full Risk Assessment and Method Statement for every structural build as standard. Stadiums, government venues and international event organisers ask for that documentation, and having it ready is often what keeps a build on schedule.
In the warehouse
Global Truss · ChainMaster · Robe · Ayrton · L-Acoustics · Unilumin
What we build
Stages & decking
Modular staging, risers, runways and thrusts, sized and built to the show design.
Truss structures
Overhead grids, goalposts, arches, towers and custom geometry in Global Truss systems.
Ground support
Free-standing tower systems where the venue offers no rigging points or will not allow structural loading.
Motors & hoists
ChainMaster hoists with controllers for flown truss, screens and scenic elements.
Certified rigging crew
Trained riggers and climbers working to documented method statements.
Load & structural calculations
Point loads, total weight and safety factors calculated and issued in advance for venue approval.
Documentation as standard
Every structural job ships with the paperwork a venue or main contractor will ask for — produced before the build, not chased afterwards:
Risk Assessment & Method Statement
Full RAMS covering the work sequence, hazards with scored risk ratings, PPE requirements, permits, emergency procedure and a crew sign-off sheet.
Rigging plot & load schedule
Where each point sits and what it carries, so the venue engineer can approve the build.
Crew competency records
Named riggers with their qualifications, supplied on request.
Build & strike schedule
A production schedule with the load-in, build, rehearsal, show and strike sequence mapped day by day.
Recent work
A few projects where we delivered this scope in Saudi Arabia.
Frequently asked
Do you provide rigging documentation for venue approval?
Yes, as standard. Every structural build comes with a Risk Assessment and Method Statement, load calculations and a rigging plot. Riyadh stadiums, government venues and international organisers all require this, and we produce it before load-in rather than in response to a request.
Can you work in a venue with no rigging points?
Yes. Ground-support towers carry the load independently of the building, which is the usual answer in hotel ballrooms, exhibition halls and outdoor sites. It changes the footprint and the weight distribution on the floor, both of which we account for in the design.
How long does a typical build take?
A conference stage with a LED backdrop is generally a one-day build. Stadium ceremonies and large outdoor structures run several days and are scheduled against your rehearsal and show dates. We issue a day-by-day production schedule so every trade knows when they have access to the site.
Do you handle the whole production or only rigging?
Either. Many clients take rigging together with audio, lighting and video as one package, which removes the coordination problem between structure and the systems it carries. We also supply rigging alone when another contractor holds the rest of the show.
Related services
Most productions combine several of these. Taking them together removes the coordination problem between suppliers.
Tell us about your event
Send the venue, the dates and roughly what you have in mind. You will get an itemised quote — equipment, crew and logistics listed separately, with no bundled surprises.